High-cooling front brake duct prepared
Designed a new front brake duct for the high brake-cooling demands of this and upcoming circuits.
View on car map →5 F1 upgrade entries from the FIA Car Presentation Submissions for the 2026 Singapore GP, organised by team and car part.
Designed a new front brake duct for the high brake-cooling demands of this and upcoming circuits.
View on car map →Changed chord distribution between three wing elements and declared a switch to a two-element SM specification, revising chordwise and spanwise loading.
View on car map →Adjusted the endplate and footplate to suit the revised front wing, and changed diveplane camber.
View on car map →Developed an existing front-wing assembly with revised endplate and flap geometry.
View on car map →Modified existing parts to enlarge the rear-wheel exit duct for the anticipated braking demands of Singapore.
View on car map →